Project Details

US 181 Harbor Bridge Project

Project Company: 

Project Scale: $1.2B contract,  6.4 miles of corridor coverage

US 181 Harbor Bridge

Project  Overview

Project Cost: $1.2B

Client

Texas Department of Transportation (TxDOT), Corpus Christi District

Scope

  • Signing – 25 Overhead Signs Structures and 12,000 SF of Signs
  • ITS – 3 DMS Signs, 5 Miles of Fiber & 31 RVSDs
  • Roadway Illumination – 200 Low Mast Poles and 10 High Mast Poles
  • raffic Signals – 4 New Traffic Signals
  • Aesthetic Lighting – 2,600 Decorative Light Fixtures on the Superstructure
  • Maintenance & Power – 500 Outlets and Lights within the Superstructure
  • Navigation Lighting/Aviation Lighting/Lightning Protection

Project Highlights

  • Longest concrete-segmental cable-stayed bridge in North America; tallest structure in South Texas.
  • 205 ft vertical clearance improves port access for larger vessels.
  • Signature user amenities: LED lighting, Bridge Aesthetic lighting, 2.4-mile shared-use path, and a mid-span belvedere overlooking Corpus Christi Bay.

Major Benefits & Impacts

Improved Traffic Flow, Reduced Congestion & Increased Port Access
  • The project replaced a 70-year-old bridge that was at the end of its usable life.
  • Increased traffic flow with additional and wider lanes both North and Southbound
  • Additional clearance over the Port allowing Supertankers ingress/egress with potential for cruise ships as well
  • The entire State of Texas and the United States will benefit from the improvements made by this bridge replacement project.
Safety Enhancements
  • Roadway Illumination throughout the project
  • New Traffic Signals
  • Dynamic Message Signs