Project Details
SR 710 / Beeline Highway Reconstruction & SR 91 / Florida’s Turnpike
Project Company: TMS
Project Scale: $129M contract, 3.1 miles of corridor coverage
Florida
Project Overview
Project Cost: $129M

Client
Florida Department of Transportation (FDOT), District 4
Scope
- 7,000LF Retaining Wall (Avg 8’ High)
- 15,500LF Coping/Junction Slab
- 7,000LF 8’ Soundwall
- 12,000LF Median Barrier Including Short And Tall Grade-Separations
- 10,500LF Gravity Wall (Avg 5.5’ High)
Project Highlights
- Engineered a Breakthrough Keyway System that doubled production rates for retaining walls—streamlining installation while maintaining structural integrity.
- Utilized a Proprietary, Patented Slipforming Process for Coping/Junction Slabs, cutting construction time and minimizing on-site disruptions.
- Introduced a Space-Saving Slipforming Method for 8-foot Soundwalls that reduced the required work zone by more than 50%, enabling safer, more efficient operations in constrained corridors.
- Designed and Implemented an Innovative Alternative Reinforcement Solution that doubled installation speed without compromising performance, delivering substantial schedule and cost savings.
- Accelerated Median Barrier Construction by combining our Patented Slipforming Process with the alternative reinforcement innovation, achieving faster production and improved traffic management.
- Optimized and Upgraded Existing Equipment through internally-engineered modifications, reducing labor demands and improving efficiency for gravity wall pours.
Major Benefits & Impacts
Improved Traffic Flow
- An Innovative at grade intersection configuration, Partial Continuous Flow Intersection (CFI) at the intersection of SR 710 and Northlake Blvd. to provide more green time for left turn movement.
- Replacement of the Florida’s Turnpike bridge over SR 710 to provide 5 lanes in each direction, with two inside lanes being managed lanes, two lanes being general purpose lanes, and outside lane being an auxiliary lane to facilitate hurricane evacuation.
Community Enhancements
- 8’ Soundwall construction to mitigate traffic noise for neighboring communities.
Safety Enhancements
- Upgrading Road-Side barriers to MASH TL-4 level