Project Details

IH 35 Northeast Expansion (NEX)

Project Company: Levy Company

Project Scale: $1.5B contract, 10 miles of corridor coverage

Florida

Project  Overview

Project Cost: $1.5B contract, 10 miles of corridor coverage

Client

Texas Department of Transportation (TxDOT), San Antonio District.

Scope

  • Signing – 72 Overhead Sign Structures and 24,000 SF of Sign Panels
  • ITS – 90 ITS Poles, 20 Miles of Fiber, 79 CCTV Cameras & 70 RVSDs
  • Roadway Illumination – 800 Light Poles and 13 High Mast Poles
  • Traffic Signals – 8 New Traffic Signals

Project Highlights

  • Build three elevated lanes in each direction (two general-purpose + one HOV) situated between existing main lanes and frontage roads.
  • Provide direct connectors linking the elevated lanes to I-410 North and Loop 1604 West; reconstruct/modify main lanes, frontage roads, ramps, and interchanges within limits.
  • Largest Single-Segment Contract Awarded by TxDOT
  • 800 Bridge Spans, 4,500 Concrete Beams, 31 million Pounds of Steel Girders, 6 Million Square Feet of Bridge Deck
  • One of the largest precast projects in Texas

Major Benefits & Impacts

Improved Traffic Flow & Reduced Congestion
  • Increased traffic flow with 3 additional lanes in either direction
  • Improved travel times with regional and long-distance travelers being separated
  •  Improved safety with added capacity and separation of traffic
Safety Enhancements
  • Roadway Illumination throughout the project
  • ITS System Upgrades through the project
  • New Traffic Signals
  • Separation of Regional and Through Traffic
Regional mobility & freight
  • Stronger I-35 links to I-410 and Loop 1604 support the San Antonio–Austin growth corridor and logistics flows